Product Introduction
1. Product Description
The flue duct system is used to convey the furnace gas generated during electric furnace operation into the dedusting system. In the event of an abnormal condition in the dedusting system, the furnace gas can be discharged directly into the atmosphere. A bell valve is installed at the top of the flue duct, which allows the smoke to be naturally released when opened.
The electric furnace is equipped with two flue ducts. The section connecting the flue duct to the furnace cover adopts a water-cooled structure. The inner surface of the non-water-cooled flue duct is designed with sprayed refractory and thermal insulation material. To ensure firm adhesion of the sprayed refractory insulation material, fixing anchor hooks are installed on the inner surface of the flue duct.
A bell valve is installed at the upper part of the electric furnace flue duct.

Features & Advantages
Effectively handles high-temperature furnace gas, stable operation.
Product Specifications
Non-standard equipment; equipment design and supply can be carried out according to customer requirements.
Optional Customization Items: design, material, size, etc.
Equipment design and supply can be carried out according to customer requirements.
Material
Material: Q235B steel.
Appearance
See photos.
Design
Equipment design and supply can be carried out according to customer requirements.
Quality Control
After the design is completed, the production process includes: fully automatic laser cutting of raw materials, machining, assembly and welding, pre-assembly, and multi-level production quality inspections.
A "7 inspections + 1 certification" quality management system is adopted, including: incoming raw material inspection, machined component inspection, welding process inspection, ultrasonic flaw detection, pre-assembly inspection, pressure testing, export packaging inspection. After completion of all inspections, a product quality certificate is issued.
Certified in accordance with:
Quality Management System: CQC GB/T19001-2016 / ISO9001:2015
Occupational Health and Safety Management System: CQC GB/T45001-2020 / ISO45001:2008
Environmental Management System: CQC GB/T24001-2016 / ISO14001:2015
EU CE Certification.
After-sales Service

1. Packaging, Logistics & Delivery
International Export Packaging Standards
2. Installation & Commissioning
Technical personnel can be dispatched overseas for installation and adjustment, or on-site installation and commissioning guidance can be provided.
3. Operation Training
Technical guidance and technical training services are available.
4. Maintenance & Repair
Long-term equipment maintenance and technical support can be provided.
5. Spare Parts Support
Long-term spare parts supply is available.
Hot Tags: flue duct system, China flue duct system manufacturers, factory